Supersonic Wind Tunnel• blowdown type
• 1.2m x 1.2m test sections (3D)
• Mach number range : 0.1 … 3.5
• Reynolds number up to 100 millions/m
• Max test run duration : 90 sec.
• Max pressure : 12 bar (settling chamber)
• Interchangeable porous transonic test section
• Variable porosity from 0.01% up to 9%
• Interchangeable 3D/2D 0.48m x 1.2m test section
• Active model/combustion capability
Equipment:• Sting mounted, internal balance
♦ TASK & TEM equipment
♦ home made systems
• Side-wall, half model balance
• Pressure measurements
♦ Digital scanning systems : 2x128 ports
♦ Dynamic pressure systems : 64 kulites
• Mach control system
• CTS system (closed loop)
• 800 mm schlieren system
• PIV under development
• IR camera
• ultra fast digital camera
|
|
|
|
Solid walls test section
|
2D test section
|
Perforated walls test section
|
- Reynolds capability (per meter); max. 100x106 (3D) , max. 150x06 (2D)
- Force and moment measurements are made using sting mounted internal strain gauge balances.
- Pressure measurements are made using pressure transducers and pressure scanning devices
- Operation is fully automatic by means of high speed Data Acquisition and Tunnel Control systems
- A 30" diameter Schlieren visualization system is in operation
- A Dorsal Visualisation system can be installed above the transonic test section
- A CTS (Captive Trajectory Simulation) system with three degrees of freedom is being developped
- A High Pressure air supply is available for jets and engine simulations.